Business Continuity & Disaster Recovery

  • Icon of a bar and line graph inside a circle with eight arrows pointing outward, symbolizing data expansion and analysis. Blue on a light background.

    Risk & Impact AnalysisIdentify threats and assess their impact to prioritize critical functions and resources.

  • A line drawing of a light bulb emerging from an open box, symbolizing innovation and creative ideas. The background is a transparent checkerboard pattern.

    Continuity & Disaster Recovery Planning Develop business continuity and disaster recovery plans to maintain operations during disruptions.

  • Two hands holding a puzzle piece, fitting it into place. The image conveys teamwork and collaboration, with large exclamation marks indicating success.

    Data Backup & Redundancy Strategies Implement backup solutions and redundancy strategies to ensure data protection and minimize downtime.

  • Icon of three silhouettes in front of a target with an arrow, symbolizing teamwork and goal achievement. The tone is focused and collaborative.

    Training, Testing & Compliance Conduct training, regular drils, and ensure regulatory compliance for effective BCDR plan execution.

Get Started
CASE STUDY

Business Continuity & Disaster Recovery Plan

Client Overview

A major pharmaceutical company needed to ensure the uninterrupted delivery of its Patient Support Programs (PSP) during unforeseen incidents affecting their call centers.

Challenges
  • The Tampa and Dallas call centers were vulnerable to infrastructure failures, natural disasters, and outages, threatening the continuity of Patient Support Programs (PSP) and patient care.
  •   The company lacked a comprehensive Business Continuity Plan (BCP) and Disaster Recovery Plan (DRP), with deficiencies in activation protocols, recovery objectives, and role definitions.
  •   Heavy reliance on specific IT systems posed risks, necessitating strong strategies to ensure system functionality and adequate staff training during crises.
Solution
  • Comprehensive Planning

    Covered Tampa/Dallas scenarios, trained staff, set 19-hour RTO.
  • Icon of three interconnected puzzle pieces with one separate piece above them, outlined in dark blue on a light gray background, symbolizing problem-solving.

    Contingency Strategies

    Outlined disaster response, remote work, and emergency procedures.
  • Light bulb and gear icons connected by arrows on a transparent background. The design implies innovation, process, and idea implementation.

    Dependencies & Teams

    Identified dependencies and formed an ERT with defined roles.
A group of four business professionals in formal attire are smiling and engaged in a discussion around a table in a bright office setting.
Results
  • A white icon on a gray background shows a clipboard with checkmarks and a dart hitting the bullseye of a target, symbolizing goals and achievement.

    Maintained uninterrupted patient support services during emergencies by implementing robust contingency strategies.

  • Two people outlined in white facing each other with a light bulb above them, symbolizing collaboration and idea generation. Minimalist design.

    Enhanced crisis preparedness with comprehensive continuity plans, minimizing downtime and ensuring swift responses.

  • Flowchart diagram showing a cycle with four segments: a document, a gear, a magnifying glass over a chart, and a checkmark, linked by arrows.

    Strengthened operational resilience by safeguarding critical systems, keeping key functions operational during crises.

ConclusionAcuvity Consulting’s BCP and DRP provided the pharmaceutical company with a robust framework to ensure uninterrupted patient support services, enhancing preparedness and operational resilience.